Bill of Material Transfer
From the BOM for a material you can create the composition of a specification that is assigned to the material in Product Safety and Stewardship
.
If an item in the BOM is changed, generating the specification composition from the BOM guarantees that the system changes the composition of the specification accordingly. As the system checks the following when it creates the worklist, the subsequent shipping of material safety data sheets for the specifications affected is thus guaranteed if Customizing is set up correctly:
The system checks whether a changed specification is used in other specifications.
The system checks whether a report exists for this specification.
The system checks whether the specification change is included in the report.
Example
You create materials in the SAP component Materials Management
.
You can create bills of material, for example, in the SAP component Production Planning
. To do this, in the SAP menu choose .
Bill of material transfer includes:
Customizable selection of BOMs and BOM items to be transferred
Conversion of Units of Measurement
You can adapt the conversions to your requirements using a customer exit in Customizing for Product Safety
.
Manual or automatic BOM transfer
Creating and changing a specification and its composition
A customer exit is available in Customizing for Product Safety
that allows you to enter your own data (such as your own dialog box, data from the material).
Automatic data generation by the Expert
A customer exit is available in Customizing for Product Safety
for integration with the Expert.
BOM transfer log
In Customizing for Product Safety
, you have processed the Bill of Material Transfer
section and fulfilled the prerequisites defined there.
The specifications involved (of the category Substance
) do not react with each other.
The BOM items must be assigned to exactly one specification in the material-specification assignment in Product Safety and Stewardship
.
The units of measurement for the BOM items must be specified in the same dimension (weight or volume).
Note
Only the first item level of the BOM is taken into account. The BOM of a material specified in the item is not therefore exploded.
The BOM is transferred as follows:
1. Process in the SAP Component Production Planning
Object | Description |
|---|---|
BOM posting | When you save a BOM, the SAP system checks whether the BOM is to be included in the worklist. You define the check criteria for the material and for the BOM header data in Customizing for |
Data transfer to | The selected BOM is placed in the worklist for the |
2. Process in the SAP Component Product Safety
Object | Description |
|---|---|
Edit worklist | In Customizing for |
| With automatic editing , the display of the worklist is skipped.
|
| With manual editing , the BOMs are displayed in the worklist. You decide yourself whether a composition should be generated.
From the worklist, the following functions are available:
|
Object | Description |
|---|---|
Generating the composition | If composition generation is triggered, the SAP system checks:
|
Calculating quantities | The quantities are calculated from the BOM items. Concentrations of the same materials are added together. More than one of the same BOM items are grouped together and the required quantities totaled. |
Creating a specification | Header data For the system to be able to create a specification, you must have specified the following values for the new specification in Customizing for
Using the environment parameters you can also control the following values:
|
Changing a specification | Header data The header data for the specification is not changed. Composition The system uses the data provider, the data origin, and the usage to check whether the composition has changed and transfers the changes as necessary for the first data record found. Identifiers The system uses the identification type, identification category, and language to check whether the identifiers have changed and transfers the changes as necessary. Material assignment If the material-specification assignment does not exist, it is created. |
Log | The process is logged so that you can track any errors that occur and correct them as necessary. |
Expert | You can configure the settings to allow calculations to be carried out. However, we highly recommend that you do not use this for time-intensive calculations. Alternatively, you can use customer exit C1L30003 to determine the relevant data from the BOM transfer and copy it to an interim table, for example. For more information, see SAP Note 889802. |